Required Documents for Third Party Inspector Review:
The list of documents normally is agreed upon in the Pre-Inspection meeting, which is held several weeks before the actual commencement of the inspection work.
The parties that participate in this meeting are the manufacturer, purchaser and third party inspection agency representatives
These are the list of documents that are normally agreed upon to be presented to the inspector:
Valve Purchase Order or Contract
Valve Manufacture Quality Control Plan
Valve Inspection and Test plan
Valve Data Sheet
Valve Approved Drawings
Valve Material Test Reports
Valve Welders Qualifications Reports
Valve NDE Procedures
Valve NDE Personnel Qualifications Reports
Valve Heat Treatment Procedure
Valve Calibration Certificates for Test Equipment
Valve Preparation and Painting Procedure
Valve Preservation, Packing and Shipping Procedure
Valve Packing List
Valve Welding Specification Procedures (WPS) and Procedure Qualification Records(PQR)
Valve Hydrostatic Testing Procedure and Water Quality Document